This is to inform that, we are in the process of compiling the requirements of new Air-conditioners to be installed at CSIR-NML for the year 2022-23. If anyone is having requirements then a hard copy note is to be routed through proper channel to Head-Engg latest by 01.07.2020(Fri). The note should bear the following:-
- Location where ACs are to be installed with approx. size of room: Length x Breadth x Height (in mtrs)
- Source of fund with date of completion of project & signature of PL
- Signature of Head of indenting dept.
(N.B. The requirements shall be only be considered after checking the feasibility by ACU & clearance from Electrical & Civil unit)